Set crew (Day 268/365)

Here’s what is left to finish before tomorrow night. If we don’t get it done by then, I doubt we will:WALLS

  • reinforce breaks in edges with slices of “corner cardboard”; attach with box rivets
  • finish painting “woodwork”
  • glue chair rails to walls
  • paint fireplace panel with architectural detail
  • cut final fireplace opening
  • hang black fabric on fireplace opening
  • paint architectural detail on other walls

SUNFLOWER TEA SET

  • paint cups
  • paint pot
  • paint tray

TURTLES

  • make turtle heads, feet (cardboard)
  • paint turtles
  • glue topaz plastic (spray with hairspray/starch?)
  • cut out turtle bases (x3)
  • cut out turtle wheels (x3)
  • cut dowels for axles (x3)
  • make axel mounts (duct tape: create ring of duct tape, tape ring to base) (x3)
  • mount lights to base (x3)
  • mount turtle to base (x3)
  • string turtles

SUNFLOWER SUITCASES

  • attach handles
  • paint

TEA TABLE

  • We need just to find a small table and drape something over it.

TOAST HEAD BAND INSTRUMENTS

  • paint bass drum, snare drum, cymbals, drum sticks (5)
  • mount straps on bass drum, snare drum

TOAST HEADS

  • cut head holes in boards
  • measure individual Toast Head, position head piece in foam block
  • attach foam to head piece
  • cut eye slit

SNOW DRIFTS

  • paint “inside” green w/ flowers
  • add felt sliders to bottom

ANGEL COSTUME

  • cut backpack up
  • cut tabs for wings
  • cut out wings (cardboard)
  • paint wings (reddish phalanges; blue feathers)
  • attach wings to tabs

If you’d like to help, email me.

In the video department, I still have to add Marmalade Man Makes a Dance to Mend Us to the end. That’s five pieces. I should be able to get that done tonight or tomorrow.

97 days to go.

Leave a Reply

Your email address will not be published. Required fields are marked *